Work disasters, chippie finishing off.
The chippies were there putting some finishing touches on. They put up the

front strips to hide the cracks in the stucco. The plasterers also were getting stuck into the walls. I had originally planned to put in three pocket doors ready for the plasterers, but because of work commitments I wasn’t able to. At work, an utter disaster was brewing, so I had to turn up and fix things. Me and two others SysAdmins are on a 24/7 roster until the disaster blows over, so I won’t get much time to do anything on the house.
Anyway, it ended up looking like

this at the end of the day.