Painting & framing — AGAIN.
The

insulation arrived this morning. They stuffed the order up and gave us R2.0 batts instead of R3.5. So they’re going to come by on monday and swap it out with the bigger batts. I was going to spend the day insulating ready for the plasterer on Monday.
So, I did some more modifying of the internal frame for the upstairs room — I bought five 3.6m 140x45 pine beams to lay down on the wall frames to strengthen it up ready for the C-section steel beam. I’ll get that next week and just stuff it up there for after we move back in to the house. No time to do it now.
I also had some lads come over and put in some Cat-5e cable for me. I ran dual cables to every room in the house. They thought I was odd having cat5e running into the bathroom. So? What’s wrong with that? ![]()