Painting & framing — AGAIN.

August 20th, 2004 Leave a comment Go to comments

The

insu­la­tion arrived this morn­ing. They stuffed the order up and gave us R2.0 batts instead of R3.5. So they’re going to come by on mon­day and swap it out with the big­ger batts. I was going to spend the day insu­lat­ing ready for the plas­terer on Mon­day.
So, I did some more mod­i­fy­ing of the inter­nal frame for the upstairs room — I bought five 3.6m 140x45 pine beams to lay down on the wall frames to strengthen it up ready for the C-section steel beam. I’ll get that next week and just stuff it up there for after we move back in to the house. No time to do it now.
I also had some lads come over and put in some Cat-5e cable for me. I ran dual cables to every room in the house. They thought I was odd hav­ing cat5e run­ning into the bath­room. So? What’s wrong with that? :)